Rewiring & new installations

Full or partial rewires, first and second fix for renovations, extensions and new build electrical infrastructure.

Residential · Commercial

Context

A rewire is building work as much as electrical work. The cable route decisions made at first fix determine how the space behaves for decades: where sockets sit, how lighting is switched, how much spare capacity exists, how much disruption a future change will cause. Planning the layout properly is the part that pays back.

Signs that assessment may be needed

  • 01Rubber, fabric or aluminium conductors, or wiring of unknown age
  • 02Insufficient socket provision leading to permanent extension-lead use
  • 03Renovation, extension or change of use that alters the electrical layout
  • 04Previous alterations carried out without documentation or testing

None of the above should be investigated by opening equipment, testing live circuits or resetting protective devices repeatedly. If any of it involves heat, smoke, water or a shock, read the safety guidance before anything else.

General scope

  • Layout planning: circuit design, socket and lighting positions, control strategy
  • First fix cabling, containment and back boxes coordinated with other trades
  • Second fix accessories, fittings, board termination and commissioning
  • Staged rewiring to keep parts of a property usable where practical
  • Testing, certification and handover documentation

How the work runs

  1. 01ScopeRooms, loads and layout preferences are walked and recorded.
  2. 02PlanA drawn or scheduled layout is agreed before cable is pulled.
  3. 03First fixCabling and containment installed with the building programme.
  4. 04Second fixAccessories and fittings installed and terminated.
  5. 05CommissionFull testing, labelling and documented handover.